Page images
PDF
EPUB

Wood trunk Aqueduct, one stretch.

Foundation, including excavation of pit,.....

443 cubic yards of masonry, laid in hydraulic cement,

$540 00

at $2.75....

30 feet, lineal, of trunk, at $7,

Foundation 7 feet below bottom of canal,.

1,218 25

210 00

$1,968 25

Feet.

[merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small]

Estimate for Aqueduct across the Genesee River, at Portageville.

36 stick of timber,481

Inches.

7 by 16 for string pieces,
716 plates,..

716 stringers & plates,..
9" 12 for towing path,..
7" 10

do.

6 " 8 hand rail,..

9" 9 fenders,.

No. of feet.

18,013.33

33,973.33

4,914.00

1,592.50

[ocr errors][merged small]

4

66

22

12" 12 do

[merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small]

594.00 1,056.00 955.50 769.50

...

600.00.

[merged small][ocr errors][merged small][merged small][merged small][merged small]

12" 18 braces,..

8 "" 14 in trunk,.

....

[blocks in formation]
[blocks in formation]
[merged small][ocr errors][merged small]

16" 16 corner posts,.

40,824.00

7,056.00 504 00 448.00

[blocks in formation]

8" 12 do.

4,176.00

[merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Total amount of timber, board measure,...... 148,069.91

Iron.

24 truss bolts, 6 ft. long 1 in. square,

24 bolts at toes of braces, 23 ft. long, in square,..

[merged small][ocr errors][ocr errors][merged small][ocr errors][merged small]

48 washers or plates for truss rods, 5 in. square in

thick,

96 washers or plates for bolts, 4 in. square in. thick, 20 bolts, 1 ft. long 1 in. square, for ice breakers,...

[blocks in formation]

654 lbs.

258 "

144 "

96" 120 "

1,272 lbs.

Masonry.

In 2 abutments, wings, counterforts, &c. ...1,987.00 c. yds. In 5 piers and ice breakers,.

1,779.57

Total number of c. yds. of masonry,.. 3,766.57

RECAPITULATION.

148,069.91 feet, board measure, of timber, including workmanship, at $14 per M.,..

3,766.57 cubic yds. of masonry, at $3,....

1,272 lbs. of iron work, at 10 c.,...

Total cost of aqueduct,...

Total length of aqueduct, 284 feet.

$2,072 96

11,299 71

127 20

$13,499 89

Cost of one opening. 42 ft. wide between abutment and pier in trunk.

Wood work, 26,808.51 ft. at $14,.....

$375 32

Iron work, 192 lbs. at 10 c.,......

19 20

Masonry in the abutment, 993.50 c. yds. at 83, .

2,980 50

$3,375 02

[blocks in formation]

MOUNT MORRIS AQUEDUCT.

$321 03

19 20

$340 23

Number of feet in aqueduct at Portage,.. 148,069.91

Deduct one opening,....

23.476.72

Feet of timber in trunk, at $15,..... 124,593.19 $1,868 90

Foundation.

2,502 ft. of timber, 12 by 12 in b.

m. for capping piles,.

...

6,188 ft. b. m. of 2 in. plank,...

31,104
6,188

Ft. of timber in foundation, at $15,. 37,292 $559 38

876 piles, at $1.50,.....

1,056 lbs. iron, at 10 c.,........

1,314 00

1,873 38

105 60

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

On account of some lifts being less than 10 feet, the average cost of hammered stone locks on the main line, per foot, will be $540.

On the Dansville side cut, per foot lift, $571.

Estimated deduction on combination of locks.

215 cubic yards of masonry, at $3,.
38 linear feet of coping, at $1.60,
11 feet of hollow quoins, at $5.50,

...

...

202 cubic yards of excavation in lock pits, at 15c.,....

404

[ocr errors]

embankment, at 13§c.,.... ..

4.300 feet (board measure,) of timber, at $7 per M... Reduction in cost of sluices,

Saving in cost of 2 locks,

$645 00

60 80

60 50

30 30

54 54

30 10

11 26

$892 50

Making a reduction in cost by combining 2 locks, of $44.061 per foot lift, and by combining 3 locks, of $59.50 per foot lift.

Cost of 2 combined locks of 10 ft. lift, at $471.77 per ft. $9,495 46 10 ft. lift, at $459.89 per ft. 13,796 94

3

66

( I. )

Ischua creek reservoir, at Farewell's dam, containing 180 acres. Value of land flowed, with the expense of clearing and

grubbing, 150 acres, at $19, .... Embankment at head of reservoir, 3,751 cubic yards, at 15c.......

Puddle in centre of bank, 780 c. yds. at 25 c.,........... Gates and fixtures for drawing off and passing surplus water,....

$2,850 00

562 65

195 00

Altering road 20 chains, at $8 per chain, ..
For Farewell's saw-mill and fixtures,

....

Lower Oil creek reservoir, containing 120 acres.

1,800 00

160 00

1,200 00

$6,767 65

Value of land flowed, with the expense of clearing 80 acres, at $16,.............

$1,280 00

Embankment at head of reservoir, 17,600 c. yards, at

15 C,.....

2,640 00

Puddle in centre of bank, 1,180 c. yds. at 25 c.,.....
Gates and fixtures for drawing off and passing surplus

295 00

water,...

Allowance for Cady's dam and fixtures,........ 66 for Baldwin's saw-mill,....

2,500 00

1,500 00

1,000 00

$9,215 00

Upper Oil creek reservoir, containing 260 acres.
Value of land flowed, with the expense of clearing 260
acres, at $14,...
Embankment for reservoir, 23,350 c. yds. at 15 c,,...
Puddle in centre of bank, 2,950 c. yds. at 25 c.......
Gates and fixtures for drawing off surplus water,..

$3,640 00

[blocks in formation]

Intersects the main line on the farm of E. Wood; is 2 miles 52 chains in length, and with the exception of 57 chains high embankment, passes along the face of an easy slope. Distance from main line of Farewell's dam, the head of the proposed Ischua creek reservoir, is 3 miles 8 chains.

[blocks in formation]

Begins on the farm of E. Wood; ends on that of John Snyder; located on an easy slope; Excavation, clay and gravel.

24,537 c. yards of excavation, at 9 c.,......

[merged small][ocr errors]

of lining, at 18 C.,.......

32 chains of grubbing, at $4,...

1 road bridge,

1 waste-weir,

$2,208 33

270 00

128 00

600 57

237 13

$3,444 03

Section 2-78 chains.

Begins on the land of John Snyder and ends on Ira Chamberlain's. The easy slope on which section 1 is located, terminates at the beginning of this section. The hill here rises abruptly from the flats for 57 chains. The embankment extends along its base, and 16 chains of docking will be necessary to protect it from the creek. The bridge over the Ischua, must be removed to a more convenient point for passing the road leading to it over the feeder. The hill is clay. Rock shows itself at several points.

17,240 cubic yards of excavation, at 8 cts.,

71,250

[ocr errors]

embankment, at 10 cts.,...

60 chains of grubbing, at $6,...

8,448 cubic ft. of docking, 8 feet high, at 6 cts.,.

1 road bridge, 12 feet wide,..

For moving bridge over the Ischua, including the ex

pense of making the necessary road,....

$1,379 20

7,125 00

360 00

506 88

381 26

150 00

$9,902 34

Section 3-53, chains.

Begins on Ira Chamberlain's land; ends on that of Davis. Line located on ground ascending gently in a transverse direction, excavation gravel.

17,649 cubic yards of excavation, at 8 cts.,......... $1,411 92

47 chains of grubbing, at $6,..

Bulk-head and fixtures at head of feeder,......

[merged small][merged small][ocr errors][merged small][ocr errors][merged small][merged small]

282 00

240 00

762 52

$2,696 44

[blocks in formation]
« PreviousContinue »