Statements accompanying the Engineer's Report.

ESTIMATE OF CULVERTS.

Culvert, 2 feet arch.

49 cubic yards of masonry, at $3 per yard,.. 3,192 ft. b. meas. (3 in.) pine plank, at $6,... Allow 10 per cent for waste,...

Work putting down foundation,.

75 cubic yds. excavation for pit, at 10 c., :

Total cost of culvert,..

Culvert, 4 feet arch.

7,164 ft. b. meas. 3 in. pine plank for foundation and

sheet piling, at $6,..

Allow 10 per cent for waste,.

Work putting down foundation,

360 cubic yds. excavation of pit, at 18 c.,...

8147 00

19 15

1 91

20 00

750

$195 56

$42 98

4.30

30 00

64 80

[blocks in formation]

10,170 ft. b. meas. 3 in. pine plank, at $6,.. Allow 10 per cent for waste,..

Work putting down foundation,

$61 02

[merged small][merged small][merged small][ocr errors]

300 cubic yds. excavation of pit, at 18 c.,.• • of masonry, at $3 per yd.,....

54 00

459 00

Total cost of culvert,.....

$615 12

Culvert, 10 feet arch.

12,138 ft. b. meas. 3 in. pine plank for foundation and

[blocks in formation]

500 cubic yds. of excavation for pit, at 18 c.,...

90 00

[merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

27,420 ft. b. meas. 3 in. pine plank for foundation and

800 cubic yds. of excavation for pit, at 20 c.,. . . .

160 00

1,542 00

Culvert, 2 arches, 12 feet each.

$164 52

16 45

75.00

Total cost of culvert,....

81,957 97

[merged small][subsumed][subsumed][subsumed][subsumed][merged small][merged small][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][merged small][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][subsumed][ocr errors][graphic][ocr errors][subsumed][subsumed][subsumed][ocr errors][ocr errors][ocr errors]

Total cost of timber, brought forward from table,.... $28 79 1,150 ft. clap-boards, for siding truss, at $12,... 1,190 ft. b. m. floor-plank, at $12,

[merged small][merged small][merged small][merged small][merged small][ocr errors][ocr errors][merged small][merged small][merged small]

13 80

14.28

856 87

....

24

in.

16

[blocks in formation]

Nails, 10 lb. 8d., 12 lb. 20d,. 5 lb. 10d. and
4 lb. 5 in. cut spikes 31 lb. at 7 cents,...

2.17

Carpenter work, ...........

7500

End casting, including materials,.

3.00

Painting, two coats white lead,

8.00

Excavation for foundation, ...

2.00

73 cubic yds. of masonry, laid in lime mortar, at $1.75, 127 75 900 cubic yds. embankment, calculated on a slope of 1

to 10, 14 feet wide on top, at 10 cents,.

90.00

$381 26

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Amount brought forward from table,....

1,800 feet of clapboards for sliding truss, at $12,. Boards and nails for casing ends of trusses....

8,000 feet of board measure, 3 inch pine plank, at $12,

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small]

848 47

21 60

1 00

36 00

$107 07

1,600 yards embankment, calculated on a slope of 1 to 12, 22 feet wide on top, at 10c.,...

275 lbs. at 9c. 24 75

Nails, 18 lbs., 8d., 18 lbs., 20d., 8 lbs., 10., and 6 lbs. 5 in. cut spikes, 50 lbs. 7c.,....

Carpenter work,

Painting with two coats of white lead,..

Excavation for foundation,....

103 cubic yards of masonry, laid in quicklime mortar, at $1.75,......

3 50

110 00

12.00

3 00

180 25

160 00

$600 57

[merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small]