(C.) Statements accompanying the Engineer's Report. ESTIMATE OF CULVERTS. Culvert, 2 feet arch. 49 cubic yards of masonry, at $3 per yard,.. 3,192 ft. b. meas. (3 in.) pine plank, at $6,... Allow 10 per cent for waste,... Work putting down foundation,. 75 cubic yds. excavation for pit, at 10 c., : Total cost of culvert,.. Culvert, 4 feet arch. 7,164 ft. b. meas. 3 in. pine plank for foundation and sheet piling, at $6,.. Allow 10 per cent for waste,. Work putting down foundation, 360 cubic yds. excavation of pit, at 18 c.,... 8147 00 19 15 1 91 20 00 750 $195 56 $42 98 4.30 30 00 64 80 10,170 ft. b. meas. 3 in. pine plank, at $6,.. Allow 10 per cent for waste,.. Work putting down foundation, $61 02 300 cubic yds. excavation of pit, at 18 c.,.• • of masonry, at $3 per yd.,.... 54 00 459 00 Total cost of culvert,..... $615 12 Culvert, 10 feet arch. 12,138 ft. b. meas. 3 in. pine plank for foundation and 500 cubic yds. of excavation for pit, at 18 c.,... 90 00 27,420 ft. b. meas. 3 in. pine plank for foundation and 800 cubic yds. of excavation for pit, at 20 c.,. . . . 160 00 1,542 00 Culvert, 2 arches, 12 feet each. $164 52 16 45 75.00 Total cost of culvert,.... 81,957 97 Total cost of timber, brought forward from table,.... $28 79 1,150 ft. clap-boards, for siding truss, at $12,... 1,190 ft. b. m. floor-plank, at $12, 13 80 14.28 856 87 .... 24 in. 16 Nails, 10 lb. 8d., 12 lb. 20d,. 5 lb. 10d. and 2.17 Carpenter work, ........... 7500 End casting, including materials,. 3.00 Painting, two coats white lead, 8.00 Excavation for foundation, ... 2.00 73 cubic yds. of masonry, laid in lime mortar, at $1.75, 127 75 900 cubic yds. embankment, calculated on a slope of 1 to 10, 14 feet wide on top, at 10 cents,. 90.00 $381 26 Amount brought forward from table,.... 1,800 feet of clapboards for sliding truss, at $12,. Boards and nails for casing ends of trusses.... 8,000 feet of board measure, 3 inch pine plank, at $12, 848 47 21 60 1 00 36 00 $107 07 1,600 yards embankment, calculated on a slope of 1 to 12, 22 feet wide on top, at 10c.,... 275 lbs. at 9c. 24 75 Nails, 18 lbs., 8d., 18 lbs., 20d., 8 lbs., 10., and 6 lbs. 5 in. cut spikes, 50 lbs. 7c.,.... Carpenter work, Painting with two coats of white lead,.. Excavation for foundation,.... 103 cubic yards of masonry, laid in quicklime mortar, at $1.75,...... 3 50 110 00 12.00 3 00 180 25 160 00 $600 57 |