Section 94-80.91 chains.

Begins on F. Miller's land; ends on that of B. Shaffer's.

Lice

on sloping ground, with the exception of 35 chains of embankment across the mouth of Big Swamp. Soil, alluvial.

19.064 yards of excavation, at 8 c.....

[merged small][ocr errors][merged small][merged small]

$1,525 12

7,782 60

452 90

983 83

589 12

811,333 57

Section 95-81.53 chains.

Begins on Shaffer's land; ends on that of J. June.

Located on

the face of a side hill of very gentle ascent. Excavation, loam.

[blocks in formation]

Section 96—81.15 chains. West of Dumplin Hill.

Begins on J. June's land; ends on the Dumplin hill farm. Located on sloping ground. Dumplin is an isolated sand bank. rising precipitately from the river and extending westward, affording a pass round the western base, by which the river is avoided without increasing the distance or adding to the expense of the canal. Excavation, sandy loam.

25,308 yards of excavation, at 8 c. ... 15,638

"

[ocr errors]

30 chains grubbing, at $7,

609 rods fence, at 70 c.

Dumplin hill, at 10 c.............

1 road bridge,

....

1 culvert, 4 feet span,.

Section 97-78.03 chains.

Begins on James Wadsworth's land; ends on Jones.

[blocks in formation]

$2,024 64

1,563 80

210 00

426 30

600 57

399 07

$5,224 38

Located

$2,080 00

408 80

600 57

381 26

235 00

$3,705 63

Section 98-81.85 chains.

Begins near Dumplin hill; passes back of Tone's tavern, and on the west side of a sand hill, lying parallel to the river, and ends on Valentine's land. It is necessary to keep up the level, to pass Black and Little Black creeks. This gives an expensive embankment across the flats for this and the following section. Soil sandy loam.

7,480 yards of excavation, at 8 c.... embankment, at 12 c....

16,600

[ocr errors]
[blocks in formation]

$658 40 7,932 00

40 00

254 80

762 52

Section 99-78.28 chains.

$9,557 72

Beginning on Valentine's, and extends across the flats to a point on McVean's farm. The whole section is embankment. Black and Little Black creeks are crossed in this section. The former by a stone aqueduct of two arches of 12 ft. span; the latter by a culvert 8 ft. span.

126,600 c. yards of embankment, at 14 c... Aqueduct over Black creek, ..

[ocr errors]

Culvert for Little Black creek,...

256 rods of fence, at 70 c..

2 bridges, 12 ft. wide,...

$17,724 00 1,958 00 809 00

396 00

762 52

$21,649 52

Section 100-81.54 chains.

Begins on McVean's land; ends on that of Bradley; located on

sloping ground. Excavation, clay.

36,000 yards of excavation, at 8 c.

40 chains of grubbing, at $8,. 452 rods of fence, at 70 c....

[ocr errors]

1 road bridge and 1 farm bridge,

$2,880 00

320 00

316 40

762 52

$4,278 92

Section 101-80.70 chains.

Begins on Bradley's land; ends on James Wadsworth's; surface

[merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Section 102-82.39 chains.

Begins and ends on the land of James Wadsworth, esq. Line on level ground, to a point near the rapids, where it passes along the face of a range of hills. It is necessary to move two small houses opposite the dam. Soil, clay; surface covered with detached rock.

42,150 yards of excavation, at 8 c...

380 rods of fence, at 70 c....

3 road bridges, ...

For moving two dwelling-houses,....

$3,372 40

266 00

1,801 71

150 00

$5,590 11

Section 103.

Begins on Wadsworth's; ends on Alonzo Frost's land; ground

undulating. Excavation, loam and clay.

[blocks in formation]

Beginning at the same point with the screw dock termination; ends at Butler's basin. The land opposite Butler's basin, is unoccupied, affording every facility for the formation of a basin of any required area. Clay and loam with a substratum of lime rock.

32,133 yards of excavation, at 8 c....

475 rods of fence, at 70 cts..

5 road bridges,....

2 locks, No. 132 and 133, 10 feet lift,.

$2,570 64

332 50

3,002 85

10,362 00

$16,267 99

Section 104-54.72 chains. (Eastern termination.)

Beginning on the land of Alonzo Frost, extends over a smooth surface to the Erie canal at the screw dock. Another termination was made at Butler's basin some distance above. There is a basin in front of the screw dock which will afford a convenient entrance into the proposed canal. Upper stratum clay; lower, lime

stone.

27,400 c. yards of excavation, at 8 cts..... 6,152

[ocr errors]

437 rods fencing, at 70 cts...

4 road bridges,..

$2,192 00 2,460 80

rock, at 40 cts.

305 90

2,402 28

10,362 00

2 locks 10 feet lift, Nos. 132 and 133,..

8 lock houses, at $2.50, ..........

$17,722 98

2,000 00

The following estimate of line located from the dam at Genesee rapids to the Erie canal, is for a distance of 2 miles 141 chains. Beginning at the dam, it extends along the bank of the river to the head of a ravine; thence down the ravine, terminates at the screw dock. The line passes over an even surface, and with the cxception of 25 chains immediately below the dam, it will not be necessary to protect the embankments. The rock excavated for the canal may be used without expense for the protection of the embankments. Excavation, loam, gravel and rock.

97,701 yards excavation, at 8 c......

[blocks in formation]

$7,806 08 22,446 40 647 80

3,603 42 4,275 00 235 00

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small]
[merged small][merged small][ocr errors][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Total of main line,..... $305,087 85

Should the route through Mount-Morris pond be

adopted, a saving of........

8,598 03

will accrue, making the cost of the western line,... $296,489 82