Page images
PDF
EPUB
[merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors]

Is in the swamp through which the line passes from Black creek to the Genesee river. The excavation is of muck and gravelly side-hill:

20,629 cubic yards of excavation, at 9 cts.,

$1,856 61

[merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Descends the ridge into the valley of the Genesee river, and terminates opposite to Major Ketchum's house. Immediately below the last lock in this section, the water is taken by a short feeder from the river:

10,486 cubic yards of excavation, at 8 cts.,

$838 88

[merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Upon this section, (31) by placing at the head of the island above Ketchum's, a dam 3 feet high and 150 feet long, and turning the river into an old channel, its water is taken into the canal by

means of a guard-lock, and a dam 5 feet high and 130 feet long, and a feeder 20 chains in length.

[merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Cost of this division, (sec. 22 to sec. 31 inclusive,) including 15 lock-houses, $223,052.35.

[blocks in formation]

Extends to a point on the land of Michael Thatcher. The soil

is a fine gravel and sandy loam:

11,674 cubic yards of excavation, at 7 cts.,

[merged small][merged small][merged small][ocr errors][ocr errors][merged small][ocr errors]

$817 18

at 8 cts.,

1,365 12

320 00

at 12 cts.,

1,680 00

200 00
40 00

4,422 30

[blocks in formation]

419 25

4,733 00

237 13

600 57

762 52

809 11

7,561 58

$11,983 88

[blocks in formation]

Extends to a point near Rice's tavern, in the township of Caneadea, crossing the Caneadea creek, which is taken into the canal by a dam and short feeder. The soil is gravel for a few chains in the centre of the section, the remainder is a sandy loam: 33,441 cubic yds. of excavation, at 8 cts.,.. $2,675 28 of embankment, at 13 cts.

[blocks in formation]
[blocks in formation]

Extends to a point near Mr. Burr's Exchange Inn. The soil is principally sandy loam.

20,000 cubic yds. of excavation, at 8 cts.. $1,600 00
of embankment, at 11 cts.
"at bridges, at 10 cts.

[ocr errors]

42,000
7,000
64 chains of grubbing, at $10,

4,620 00

700 00

640 00

$7,560 00

648 rods of fence, at 65 cts....

421 20

3 locks, 1 of 8 and 2 of 7 feet lift,........

13,733.00

[blocks in formation]

Extends to a point in Webster Herrick's land, near the water power turning mill, and passes through an old slide bank in its vicinity. The excavation varies at different points, from sandy loam on gravel to hard clay and gravel banks.

16,000 cubic yds. of excavation, at 8 cts.. $1,280 00

[ocr errors][ocr errors][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small]

1,100 00 2,760 00

376 80

at 11 cts..

244 09

50 00

$5,810 89

424 75

237 13

762 52

1,425 40

$7,236 29

Section 36-778% chains.

Extends to a point on Mr. Caldwell's land, through rich sandy alluvial flats.

23,400 cubic yds. of excavation, at 7 cts.. $1,638 00

[merged small][ocr errors][ocr errors][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[blocks in formation]

Extends about a quarter of a mile beyond Gorton's tavern, on the late Indian reservation. The soil at the south end is a sandy loam, at the north clay and gravel.

13,448 cubic yds. of excavation, at 7 cts.... $941 36

[merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

This section passes the great slide bank on the reservation. The excavation consists of clay and sand with a small portion of sandy loam at the south end. The estimate below includes the expenses of turning the river from its present channel for the better security of the work.

31,000 cubic yds. of excavation, at 8 cts.. $2,480 00

[ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small]

Dams and protection for 9 chains of bank,. 4,000 00

[blocks in formation]

Extends into the road through the reservation beyond Miner's.

The soil is sandy loam and gravel.

45,234 cubic yds. of excavation, at 8 cts.. $3,618 72

10,325

[ocr errors]

embankment, at 9 cts.

929 25

60 chains of grubbing, at $7,

420 00

$4,967 97

[blocks in formation]

1,301 25

$6,269 22

[blocks in formation]

Extends past Longbeard's Rift. Soil gravelly.

51,627 cubic yds. of excavation, at 8 cts.. $4,130 16

23,859

10,500

[ocr errors]
[ocr errors][ocr errors]

80 chains of grubbing, at $7, . . . .

320 rods of fence, at 65 cts

1 road bridge, 2d class,

[blocks in formation]
[blocks in formation]

$7,887 47

208 00

381 26

589 26

$8,476 73

This section crosses Cold creek, in the township of Hume. Soil gravel and clay.

68,392 yards of excavation, at 8 cts...... $5,471 36

[merged small][merged small][ocr errors][ocr errors]

at 14 cts..... 567 84 embankment, at 13 cts...

9,620 00

490 00

$16,149 20

70 chains of grubbing, at $7, ...

520 rods of fence, at 65 cts....
1 culvert and 2 arches of 12 feet span,..
4 road bridges, 2 of 1st class 2 of 2d class,.

[merged small][merged small][merged small][merged small][merged small][ocr errors][ocr errors][merged small][merged small]

Extends to a point near the Round Flat on the lands of Mr. Wadsworth of Geneseo. The soil is clay resting on gravel.

22,681 cubic yds. of excavation, at 8 cts... $1,814 48

[merged small][merged small][merged small][ocr errors]

47 chains of grubbing, at $7,.

2,990 00

876 00 329 00

[blocks in formation]

This section includes the descent to the Round Flat. The soil

is sand resting on gravel.

17,444 cubic yards of excavation, at 8 cts.. $1,395 52

14,000

66

12 cts.. 1,680 00

Carried forward,........

« PreviousContinue »