Begins on Thomas Lockwood's land; ends on that of James Brooks. Located on sloping ground and along the flats.

.....

vation, clay, loam and gravel:
17,842 yards of excavation, at 8 cts.
16,932
embankment, at 10 cts.,..
65 chains of grubbing, at $10,.

[ocr errors]

320 rods of fence, at 65 cts., 1 farm bridge,

...

$1,427 36

Exca

1,693 20
650 00

$3,770 56

[blocks in formation]

1 waste-weir,

[blocks in formation]

235 00

824 26

$4,594 82

Begins on James Brooks' land; ends on Located on the flat and on sloping ground. gravel:

27,664 yards of excavation, at 10 cts.,....

[blocks in formation]

that of Mr. Barrow. Excavation, clay and

$2,756 40

2,158 20

484 75
282 00

$5,581 35

$381 26

200 20

581 46

86,162 81

Section 6-7935 chains,

Begins on Mr. Barrow's land; ends on that of Archibald Case.

Located in a marsh and on sloping ground:

18,565 yards of excavation, at 71 cts.

[blocks in formation]
[blocks in formation]

Begins on Archibald Case's land; ends on that of Clement Fay. Located on flats. Excavation, clay and sand.

37,814 yards of excavation, at 8 c., ...... $3,025 12

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Beginning on the land of Clement Fay; terminates on that of Wood, Esq. Located on the flats, through meadows and timbered land. Excavation, alluvion and gravel.

11,741 yards of excavation, at 10 c.,.... 21,462

$1,174 10

71 C.,...

1,609 65
232 00

29 chains grubbing, at $8,.. 3,342 yards of excavation for the feeder,

[blocks in formation]

embankment, at 12 c.,

[merged small][ocr errors]

Beginning on the land of Wood, Esq., passes over the flats to a point on that of Hollis Scott. Excavation, alluvion and river gravel.

25,721 yards of excavation, at 8 c., ......

[ocr errors]

28,336
40 chains of grubbing, at $6,

586 rods of fence, at 65 c.,

$2,057 68

[ocr errors]

3,400 32

240 00

$5,698 00

380 90

[blocks in formation]

Cost of this division to section 10, $110,869.87.

Section 10,

Begins on the land of Hollis Scott; ends on that of James Armstrong. Excavation, loam and gravelly clay.

9,520 yards of excavation, at 15 c.,

.....

19,399

19,079

do do

do

-8 C.,

$1,428 00
1,551 92

[blocks in formation]

$4,887 82

160 rods of fence, at 65 c.,..

4 locks, (No's. 1, 2, 3, 4,) 1,7 ft. lift, and

$104 00

3 8 ft.,

2 road bridges,

1 farm do

18,699 00

762 52

381 26

19,946 78

$24,834 60

Section 11-80% chains,

Begins on the land of James Armstrong; ends on that of Orin Hull. Located on side hili, and very gently ascending ground. Excavation, gravelly clay.

19,577 yards of excavation, at 9 c.,...... 12,705 do embankment, at 11 c.,...

[blocks in formation]

Begins on the land of Orin Hull, ends on that of Mr. Robinson. Part of the line on the side hill, the remainder on gently ascending ground. Excavation principally gravelly clay.

21,978 yards of excavation at 9 cts....

1,400 " of embankment, at 10 cts.....

83 chains of grubbing, at $10,

[blocks in formation]

Begins on Mr. Robinson's land and passes along the face of a gentle slope, to that of Mr. Warson. Excavation, clay mixed with hard flat stones.

33,000 yards of excavation, at 10 cts...... $3,300 00

[blocks in formation]
[blocks in formation]

Begins on L. Warson's land, ends on that of Joseph Bristol; principally on sloping ground. Excavation, loam, clay and gravel. 33,879 yards of excavation, at 8 cts....... $3,710 32

[blocks in formation]

Beginning on the land of Joseph Bristol, extends along the side hill to a point on that of Judge Chamberlain. Excavation, clay and gravel.

33,167 yards of excavation, at 8 cts....... $2,653 36

[merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Begins on Judge Chamberlain's land, ends on that of Stephen Smith. Ground slightly ascending in a transverse direction. Ex

cavation, clay and gravel.

21,821 cubic yards of excavation, at 8 cts.. $1,745 68

53 chains of grubbing, at $10,....

[blocks in formation]

530 00

2,275 68

235 00

381 26

616 26

$2,891 94

Begins on the land of Stephen Smith, in marshy ground, ends

on that of Aaron Ingols. Excavation, alluvion.

29,016 cubic yards of excavation, at 8 cts.. $2,321 28

35 chains of grubbing, at $8,.

320 rods of fence, at 65 cts....

1 road bridge, 12 feet,.

1 farm do.

Section 18.

280 00

2,601 28

208 00

381 26

381 26

970 52

$3,571 80

Begins in the summit swamp on the land of Aaron Ingols, ends on that of John Powers. Excavation, muck with substratum of clay.

28,831 cubic yards of excavation, at 81 cts. $2,450 68 20 chains of grubbing, at $10,........

[merged small][ocr errors][merged small][merged small]

200 00

2,650 68

381 26

381 26

762 52

$3,413 20

Begins at a point on the land of John Powers, and passes through the summit swamp to one on that of Phineas Baldwin. Excavation, muck.

71,251 cubic yards of excavation, at 12 cts. $8,550 12 56 chains of grubbing, at $5,....

280 00

[merged small][ocr errors]

of alder bushes, of $2,

50 00

8,880 12

1 farm bridge for both proprietors, .

381 26

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][subsumed][subsumed][ocr errors][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]