Brought forward, ...... 320 rods fence, at 65 cts.,...

$208 00 i lock (No. 8,) 8 feet,.

4,733 00 i farm bridge,

381 26

5,322 26

$8,818 40

Section 4-801 chains, Begins on Thomas Lockwood's land; ends on that of James Brooks. Located on sloping ground and along the flats. Excavation, clay, loam and gravel: 17,842 yards of excavation, at 8 cts. ..... $1,427 36 16,932

embankment, at 10 cts.,.. 1,693 20 65 chains of grubbing, at $10,.........

650 00

$8,770 56 320 rods of fence, at 65 cts.,

$208 00 i farm bridge,

381 26 I waste-weir,

235 00

824 26

$4,594 82

Section 5—77 1ői chains, Begins on James Brooks' land; ends on that of Mr. Barrow. Located on the flat and on sloping ground. Excavation, clay and gravel: 27,664 yards of excavation, at 10 cts.,.... $2,756 40 21,582

embankment, at 10 cts.,... 2,158 20 5,130 excavation, at 71 cts.,

484 75 47 chains of grubbing, at $6,....

282 00

85,581 35 i farm bridge,

$381 26 308 rods of fence, 65 cts.,

200 20

581 46

86,162 81

Section 6-7916 chains, Begins on Mr. Barrow's land; ends on that of Archibald Case. Located in a marsh and on sloping ground: 18,565 yards of excavation, at 71 cts. $1,392 37 34,944

9 cts.

3,144 96 17 chains of grubbing, at $8,........

136 00 38 bushes, at $2,

76 00

$4,749 33 639 rods of fence, at 65 c. per rod,

$415 35 2 farm bridges,

762 52

1,177 87

85,927 20

71 C.,

Section 7-8916 chains, Begins on Archibald Case's land; ends on that of Clement Fay. Located on flats. Excavation, clay and sand. 37,814 yards of excavation, at 8 c., ...... $3,025 12 7,735

580 12 7,820 embankment, at 9 c.,

703 80

84,309 04 320 rods of fence, at 65 c.,

$208 00 2 road bridges, 12 feet,

762 52 1 lock, (No. 7,) 8

4,733 00 1 waste-weir,

235 00

5,938 52

$10,247 56

Section 8–80,45 chains, Beginning on the land of Clement Fay; terminates on that of Wood, Esq. Located on the flats, through meadows and timbered land. Excavation, alluvion and gravel. 11,741 yards of excavation, at 10 C.,.... $1,174 10 21,462

71 C., ...

1,609 65 29 chains grubbing, at $8,..

232 00 3,342 yards of excavation for the feeder, at 7) C.,...

250 65

$3,266 40 647 rods of fence, at 65 C.,...

$420 55 I dam, 130 feet long, with bulkhead,

850 00 1 waste-weir,

235 00 2 farm bridges,

762 52

2,268 07

$5,534 47 Section 9–78,1%chains, , Beginning on the land of Wood, Esq., passes over the flats to a point on that of Hollis Scott. Excavation, alluvion and river gravel. 25,721 yards of excavation, at 8 C., ...... 82,057 68 28,336 embankment, at 12 c., ...

3,400 32 40' chains of grubbing, at $6,..

240 00

85,698 00 586 rods of fence, at 65 c.,

380 90 2 locks, (No's. 5 and 6,) 8 feet each,

9,466 00 1 road bridge,

600 57 1 aqueduct over the Ischua,

2,421 40

12,868 87

$18,566 87

Cost of this division to section 10, $110,869.87.

do do

8 C., 10 C.,

Section 10, Begins on the land of Hollis Scott; ends on that of James Armstrong. Excavation, loam and gravelly clay.

9,520 yards of excavation, at 15 C., ..... $1,428 00 19,399 do

1,551 92 19,079 do

1,907 00

$4,887 82 160 rods of fence, at 65 C., ...

$104 00 4 locks, (No's. 1, 2, 3, 4, 1, 7 ft. lift, and 3 8 ft.,

.. 18,699 00 2 road bridges,

762 52 1 farm do

381 26

19,946 78

$24,834 60 Section 11-8020 chains, Begins on the land of James Armstrong; ends on that of Orin Hull. Located on side hili, and very gently ascending ground. Excavation, gravelly clay. 19,577 yards of excavation, at 9 C.,...... $1,761 93 12,705 do embankment, at 11 C.,...

1,397 55 3,788 do do

340 92 49 chains of grubbing, at $10,

490 00

$3,990 40 1 road bridge, 12 ft.,

381 26

9 C.,...

$4,371 66 Section 12—8370o chains, Begins on the land of Orin Hull, ends on that of Mr. Robinson. Part of the line on the side hill, the remainder on gently ascending ground. Excavation principally gravelly clay. 21,978 yards of excavation at 9 cts.

1,978 02 1,400 of embankment, at 10 cts..

140 00 83 chains of grubbing, at $10,

830 00

2,948 02 1 waste-weir,

235 00 1 farm bridge,.....

381 26

616 26

$3,564 28 Section 13—791 chains, Begins on Mr. Robinson's land and passes along the face of a gentle slope, to that of Mr. Warson. Excavation, clay mixed with hard flat stones. 33,000 yards of excavation, at 10 cts...... $3,300 00 5,152

of embankment, at 11 cts. .... 566 72 53 chains of grubbing, at 12,....

636 00

4,502 72

Carried forward, ......

1 farm bridge, ...

Brought forward, ...... $

381 26

381 26

$4,883 98

Section 14–81jío chains, Begins on L. Warson's land, ends on that of Joseph Bristol; principally on sloping ground. Excavation, loam, clay and gravel. 33,879 yards of excavation, at 8 cts....... $3,710 32 51 chains of grubbing, at 812,.....

612 00

4,322 32 176 rods of fence, at 65 cts.....

114 40 2 waste-weirs,...

470 00 1 farm bridge,........

381 26

965 66

$5,287 98

Section 15—7970chains, Beginning on the land of Joseph Bristol, extends along the side hill to a point on that of Judge Chamberlain. Excavation, clay and gravel. 33,167 yards of excavation, at 8 cts....... $2,653 36 27,866 of embankment, at 10 cts.... 2,786 60 30 chains of grubbing, at $10,...

300 00

5,739 96 316 rods of fence, at 65 cts.

205 40 1 road bridge, 22 feet wide,.....

600 57 1 waste-weir,

235 vo

1,040 97

86,780 93

Section 16—84, chains. Begins on Judge Chamberlain's land, ends on that of Stephen Smith. Ground slightly ascending in a transverse direction. Ex. cavation, clay and gravel. 21,821 cubic yards of excavation, at 8 cts.. $1,745 68 53 chains of grubbing, at $10, ...

530 00

2,275 68 1 waste weir,

235 00 1 farm bridge,...

381 26

616 26

$2.891 94

Section 17, Begins on the land of Stephen Smith, in marshy ground, ends on that of Aaron Ingols. Excavation, alluvion.

29,016 cubic yards of excavation, at 8 cts.. $2,321 28 35 chains of grubbing, at $8,.....

280 00

2,601 28

320 rods of fence, at 65 cts.....
1 road bridge, 12 feet,........
1 farm do.

208 00
381 26
381 26

970 52

$3,571 80

Section 18, Begins in the summit swamp on the land of Aaron Ingols, ends on that of John Powers. Excavation, muck with substratum of clay. 28,831 cubic yards of excavation, at 84 cts. $2,450 68 20 chains of grubbing, at $10,...

200 00

2,650 68 1 road bridge, 12 feet,

381 26 I farm do

381 26.

762 52

$3,413 20

Section 19. Begins at a point on the land of John Powers, and passes through the summit swamp to one on that of Phineas Baldwin. Excavation, muck. 71,251 cubic yards of excavation, at 12 cts. $8,550 12 56 chains of grubbing, at $5,..

280 00 25 of alder bushes, of $2,

50 00

8,880 12 I farm bridge for both proprietors,

381 26

381 26