Rotes Nos. 5, 19 & 22 Routes Nos. 5, 43 & 16 — Track Installation, Lexington Ave. Subway, 149th St. Connection & Jerome Ave. Extension Empire Const. Co. Installation of tracks. Terry & Tench Co., Inc. 3/30/16 Track Installation, Pelham Line 2 /7/17 9/30/16 276,433.55 95 67 363,860.00 26 172 Altoria Realty & Const. Co. Routes Nos. 16 & 18 Station Finish, Jerome Avenue & White Plains Road Lines Jerome Ave. & White Plains Road Lines. 10/13/15 4/13/16 860,636.50 85.5 45 Routes Nos. 19 & 22 1 Richard Carvel Co., Inc. Southern Boulevard & Westchester Avenue Extension 138th St. & Southern Boulevard, Alexander Ave. to 147th St. 10/22/12 8/22/16 2,253,281.75 98 122 1-A Rodgers & Hagerty, Inc. 2† Assigned to Flick & Manuell Const. Co. Westchester Ave., Whitlock Ave. to Pelham Bay Routes Nos. 4 & 38 - Seventh Avenue-Lexington Avenue Subway Routes Nos. 4 & 38 and 43 Station Finish, Seventh Avenue Subway and Diagonal Station Connection Assigned to John B. Roberts. Sections 5, 6 and 6-A of Routes 4 & 38; Sections 1 12/5/16 and 2 of Route 43 Route No. 48- Park Place, William and Clark Street Subway Park Place and Beekman St., West Broadway to William St. 12/7/14 4 /7/17 1,571,363.50 95 136 † Forfeited and to be completed by Public Service Commission. William St., Beekman St. to Old Slip. Average Engel & Hevenor Routes Nos. 4 & 38, 48 and 33- Track Installation, Seventh Avenue Subway Installation of tracks. 11 1/16 $229,440.50 73 148 1 Cranford Company. Route No. 12- Eastern Parkway, Brooklyn, Subway Flatbush Ave. and St. Felix St., Fulton St. to Prospect Place 7/16/14 1/16/17 2,195,296.25 1-A Cranford Company. Flatbush Ave., Prospect Place to Plaza. 5/4/14 11 /4/16 2,225,519.25 2 Inter-Continental Const. Corp. Eastern Parkway, Prospect Park Plaza to Nostrand Ave. 6/15/15 4/15/17 2,744, 263.00 Eastern Parkway, Nostrand Ave. to Buffalo Ave. Station finish, Sections 1, 1-A, 2 and 3. Route No. 29 Nostrand Avenue, Brooklyn, Subway 1 Assigned to Newman & Carey Subway Nostrand Ave., Eastern Parkway to Church Ave. Construction Co., Inc. Route No. 31 Livonia Avenue, Brooklyn, Extension Livonia Ave., President St. to Ashford St. (con 2/28/17 7/28/18 257,164.00 24 10 struction) Supply of structural steel. Livonia Ave., Duct Line Routes Nos. 36 & 37 Woodside, Astoria and Corona Elevated Line Queensboro Bridge Plaza, Jackson Ave. & Diag- 10/7/13 2/28/17 7/28/18 10/23/17 1,431,755.00 0.29 38,697.00 58 46 4 /3/16 884,859.00 100 onal Street 2 Cooper & Evans Company. Second Ave., Beebe Ave. to Ditmars Ave. 3/11/13 9/11/14 860,743.50 100 3 E. E. Smith Contracting Co. Queens Boulevard & Roosevelt Ave., Van Dam St. 3/11/13 1 /7/16 2,063,588.00 100 to Alburtis Ave. Routes Nos. 36 & 37, 16 and 18- Signal Towers for Queens and Bronx Lines 9/11/17 10/11/17 2,150.00 100 H. C. Stowe Const. C 13 signal towers for Queens Lines, and Jerome Ave. 1/16/17 5/16/17 and White Plains Road extensions 110,650.71 60 4 Routes Nos. 36 & 37 and 50 1 & 3 and R. 50 Snare & Triest Co. Station finish, Queensboro Subway Extension and 10/4/15 4/4/16 Corona Line 609,885.00 88.2 5 Degnon Contracting Co. Route No. 50 Queensboro Subway Extension 4 /3/16 557,856.50 100 Station Construction Co Station finish for Hunters Pt. Ave. station, for 11/22/15 temporary operation 1/15/16 2,999.99 100 Degnon Contracting Co. Station finish for Hunters Pt. Ave. station 4/26/16 8/26/16 32,219.22 100 COMPANY CONTRACTS Third-tracking Elevated Railroads in Manhattan and The Bronx Terry & Tench Co., Inc., Snare & Triest Additional_tracks on Second, Third and Ninth 2/13/14 8/13/15 Avenue Elevated Lines (Cost plus per- Extensions of Elevated Railroads in Manhattan and The Bronx West Farms Subway Connection. 7th Ave., Lexington Ave., Jerome Ave., Pelham Bay Park, White Plains Rd., Eastern Parkway, Queensboro Lines A. C. & D. C. feeder, telephone, signal and control Signal and interlocking apparatus. Contact rail feed circuit breakers.. Contact rail, contact rail fittings and bonds. Drainage equipment (pipe, air compressors) Emergency alarm and lighting fixtures, conduit, Installation of tunnel lighting and station lighting, heating and toilet ventilation Elevators and escalator balustrades, Grand Central 800 steel cars (material only) Additional tracks 2d Ave., 3d Ave., 9th Ave. Signal and interlocking apparatus. Extensions 720,000.00 699,488.42 Webster Ave., Queensboro Br., West Farms Conn., 8th Ave. & 162d Street 21,317.33 2,677,373.22 A. W. King Routes Nos. 4 & 36 - Station Finish for 34th Street and Times Square Stations Routes Nos. 4 & 36 - Broadway-Fourth Avenue Subway Broadway, Union Sq. to 26th St. 8 /1/13 8 /1/16 2,056,702.50 99.9 23 Broadway, 26th to 38th St. 7/23/14 3/23/17 2,657,004.50 88.3 322 Broadway and Seventh Ave., 38th to 51st Street. Seventh Avenue, 51st to 59th Street 9/8/15 5 /8/17 3,740,913.50 63.4 1,018 5/26/15 3/26/17 1,937,509.00 75.5 358 59th and 60th Sts., 7th to 2d Ave. 8 /6/14 1/6/17 2,319,511.00 80.6 364 Whitehall St., Manhattan, to Montague St., 7/16/14 1/16/18 5,974,809.50 85 325 3 Flinn-O'Rourke Co., Inc Montague Street, Clinton Street to Flatbush 10/9/14 10/9/17 3,395,152.00 80 308 7/16/14 3/16/17 1,822,994.25 Routes Nos. 5, 4 & 36, 20 and 33 Track Installation, Broadway-Fourth Avenue Subway Installation of tracks. 92.1 22 8/30/16 288,400.00 45 87 |