Documents of the Assembly of the State of New York, Volume 22; Volume 141, Issue 22 |
From inside the book
Results 1-5 of 84
Page 22
These sewers are now used to carry storm water but it is intended to disconnect
all pipes conducting storm water to these lines, and to carry the storm water in the
gutters or in new storm sewers to be constructed later if necessary. The pipes ...
These sewers are now used to carry storm water but it is intended to disconnect
all pipes conducting storm water to these lines, and to carry the storm water in the
gutters or in new storm sewers to be constructed later if necessary. The pipes ...
Page 23
The proposed sewage disposal plant is to be located on the west bank of the
Bozen Kill about 4% mile east of the village and consists of an Imhoff tank,
sprinkling filter, chlorination plant, final settling tank and sludge drying bed. The
works are ...
The proposed sewage disposal plant is to be located on the west bank of the
Bozen Kill about 4% mile east of the village and consists of an Imhoff tank,
sprinkling filter, chlorination plant, final settling tank and sludge drying bed. The
works are ...
Page 25
That both the sewers and sewage disposal works shown by plans approved this
day shall be fully constructed in ... That if at any time in the future the spring near
the proposed sewage disposal plant is used as a source of water supply for the ...
That both the sewers and sewage disposal works shown by plans approved this
day shall be fully constructed in ... That if at any time in the future the spring near
the proposed sewage disposal plant is used as a source of water supply for the ...
Page 26
That only sanitary sewage and no storm or surface water from streets, roofs or
other areas shall be admitted to the proposed sewers and sewage disposal
works. 3. That no sewage scum or sludge from any part of the disposal works
shall be ...
That only sanitary sewage and no storm or surface water from streets, roofs or
other areas shall be admitted to the proposed sewers and sewage disposal
works. 3. That no sewage scum or sludge from any part of the disposal works
shall be ...
Page 28
Sewer system The proposed sewer system which has been designed on the
separate plan covers practically all the present streets and highways in the sewer
district. The sewers vary in size from 8 to 36 inches in diameter and are designed
...
Sewer system The proposed sewer system which has been designed on the
separate plan covers practically all the present streets and highways in the sewer
district. The sewers vary in size from 8 to 36 inches in diameter and are designed
...
What people are saying - Write a review
We haven't found any reviews in the usual places.
Other editions - View all
Common terms and phrases
accordance additional affected Albany appears application approved avenue births capacity causes cent chapter chlorinated Commissioner of Health communicable diseases constructed Continued death rates deaths Department designed discharge disease district Division effluent Engineer examination extension Falls feet fever filter flow gallons given health officer Hospital Hudson important inches increased infant infection institution June laboratory Laws less located milk months mothers necessary nurses º e º º º occurred operation outlet period permit person physicians pipe plans population present proposed proposed sewers Public Health public supply pumping recommend Regulation Rest Rest of county river sanitary settling tank sewer shown sludge station street submitted Table tion Towns treatment tuberculosis typhoid village water supply Watervliet welfare York City